Updates on other ongoing projects:

 

One of the Prop O bond projects is in process at LOLC and the old Spokane Middle School. Installing a new fire alarm system at this location addresses two areas within Prop O, it improves the safety of the learning environment at LOLC for incoming students and staff, and this system is one step towards preparing the old MS for usage in the future. Branson Security and Fire is installing the new fire alarm system, and we are thankful for their work!

Fire Alarm System installation worker

Other Projects in progress:

 

  • Wilson signal repeater system inside Highlandville Elementary- 911 signal certified- Awaiting installation
  • High School Roof replacement of classroom section (32,000 sq. ft.) Installation is almost complete
  • New field house to include a concession stand, press box, outdoor restrooms, and new sound system to service the Spokane High School Track and Softball Field area- Architects are currently in the design and blueprint stage of construction
  • High Resolution Security Camera System upgrades- Site assessment, engineered drawing, and developement stage of this project